Completed Projects
1. Overlay and modernization of Lahore Islamabad Motorway on Build Operate Transfer (BOT) basis:
The Project envisaged overlay and modernization of 357 km long 6-lane access controlled toll road connecting Lahore and Islamabad cities on BOT basis at a cost of US$ 460 million. Read More
2. Construction of Habibabad Flyover on BOT basis:
The Project envisaged construction of 1 km long Habibabad Flyover on BOT basis at a cost of US$ 8 million. Read More
3. Conversion of existing 4-lane super highway into 6-lane Karachi Hyderabad Motorway on BOT basis:
The Project envisaged construction and conversion of existing 4-lane 136 km long super highway into 6-lane access controlled motorway connecting Karachi and Hyderabad cities on BOT basis at a cost of US$ 430 million. Read More
4. Construction of Lahore Sialkot Motorway on BOT basis:
The Project envisaged construction of green-field 90 km long 4-lane access controlled motorway connecting Lahore and Sialkot cities on BOT basis at a cost of US$ 438 million. Read More